How to Run a SMED Changeover Study on a Stamping Press
A practical guide to running a SMED changeover study on a stamping press. Film and time the die change, separate internal from external work, streamline what is left without skipping the safety rules, and use a worksheet to decide whether the freed minutes go to capacity or to smaller batches.